Preparing the BIM Execution Plans (BEP).
Preparing the BIM Manuals and other required plans.
Modelling of Existing As-Built buildings, infrastructure and utilities, from Laser Scans or other survey inputs.
Design and Modelling services for all disciplines since the conceptual development of a project to the delivery of the Construction Documentation (IFC) to LOD 300 ~ 350.
Leading or Assisting in the process of raising the right and effective Requests for Information (RFI) to the Employer or Project Manager.
Preparing the Clash Detection and Resolution reports.
Leading or Assisting the Design Firm, during the Interdisciplinary Design Coordination Workshop.
Preparing complete 2D design documentation from Coordinated BIM (LOD 300 ~ 350) for all disciplines.
Reviewing the BIM submissions by Sub-Consultants for Compliance with Employer’s specifications and requirements.
Reviewing the BIM submissions and reporting on the constructability of the Methods and Designs procured by Sub-Consultants.
Leading or Assisting on the enforcement of the right Design Change Management.
Performing all necessary and required Crowd movement studies for various scenarios, to ensure the effective operation of the project, on a-day-to-day basis and during emergency situations.
Performing all necessary 3D simulations to ensure that all operational elements (cars, tracks, buses, trains, etc.), and other sizeable permanent elements (AHUs, etc.) of the project are clash free and their swept path remains uninterrupted.
Preparing the requirements and/or implementing the Common Data Environment (CDE).
Preparing and performing the QA/QC plans in the BIM process, including the work by Sub-consultants.
Preparing the Material take-offs to assist the BoQ development or BoQ control.
Preparing and Controlling the Gross-Floor-Areas for a project.
Preparing and managing the Room Data Sheets, which are extracted from the BIM.
Leading or Assisting in the development of the Materials Specifications and link them with the BIM.
Preparing and Ensuring that the BIM is inclusive of the right non-graphical information for the Facility Management of the project, as per Employers requirements.
Leading or Assisting on the Development of BIM Augmentation reviews for Design verification and acceptance.
Leading or Assisting during the project Tendering processes for the BIM, by analysing the requirements of performance and deliverables.